Neptune (AT 575)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Key Development Metrics
- Project sanction and start-up
- Platform
- Hull
- Mooring & Tendons
- Deck/Topsides
- Subsea
- Drilling
- Exploration and Appraisal Costs
- Capital Costs
- Operating Costs
- Cash Flow
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapFIeld MapParticipation
-
Field Hydrocarbon CharacteristicsReserves (2P) at 01/01/2026Production (2020-2025)Production ProfileCapital Costs Pre-2019 to 2025 (US$ million)Operating Costs 2026 to 2031 (US$ million)Cash Flow (US$)PV Table (US$)
- 7 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Seagull
The Seagull high pressure/high temperature (HP/HT) field lies in the Central North Sea, 17 kilometres south of the ETAP (BP) Central ...
$3,720bpTT Assets (LNG)
This analysis covers all assets operated by BpTT, a joint venture comprising BP (70%) and Repsol (30%). The operations are the most ...
$3,720Tambaredjo Area
This analysis encompasses Staatsolie's producing fields in the coastal plains of Suriname. Tambaredjo, Tambaredjo Northwest and ...
$3,720