Insight
New project sanctions jump in 2017: Q2 pre-FID upstream project tracker
Report summary
In 2016 we saw 12 major projects reach sanction. We're not yet halfway through 2017, and we've already passed that number, with 13 FIDs on the board. Together, it equals over seven billion boe sanctioned so far, versus nearly nine billion boe for the whole of 2016. We remain well on the way to our January forecast of 20-25 major FIDs during the year.
Table of contents
- New project sanctions jump in 2017: Q2 pre-FID upstream project tracker
Tables and charts
This report includes 1 images and tables including:
- New project sanctions jump in 2017: Q2 pre-FID upstream project tracker: Image 1
What's included
This report contains:
Other reports you may be interested in
Insight
Q1 2024 pre-FID upstream project tracker: slow start but activity to pick up
Our Q1 2024 outlook for global pre-FID upstream projects.
$6,750
Asset Report
Relincho (Closed) copper mine project
A detailed analysis of the Relincho copper mine project.
$2,250
Asset Report
M25
A Russian-led consortium operates the giant M25 sour gas field in south Uzbekistan, close to the border with Afghanistan. A PSC was ...
$4,400