Asset Report
Nigg Oil Terminal
Report summary
The terminal at Nigg Bay was built in 1979 to accept Beatrice crude via pipeline, following government refusal to sanction offshore loading. The terminal now receives no throughput and is in the early phases of decommissioning. Throughout the life of the terminal, it processed crude from four different fields in the UK Central North Sea before production ceased in 2015.
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- Terminal leasing
- Decommissioning to start in 2023
- Green methanol plant planned at the terminal
- Location maps
- Participation
-
Development
-
Terminal
- Pipeline System
-
Terminal
-
Throughput
- Terminal
- Costs
Tables and charts
This report includes 5 images and tables including:
- Key facts: Table 1
- Nigg Bay Terminal map
- Participation: Table 1
- Throughput: Table 1
- Development: Table 1
What's included
This report contains:
Other reports you may be interested in
Asset Report
Flotta Oil Terminal
The Flotta oil terminal in the Orkney Islands was constructed in 1973 to receive oil and gas from the Piper and Claymore fields in the ...
$2,150
Asset Report
Gassled-Franpipe Pipeline and Terminal
The Franpipe pipeline (formerly known as Norfra) was constructed in response to an increasing demand for gas in continental Europe.
$2,150
Asset Report
PM9
The PM9 PSC consists of five fields located offshore Peninsular Malaysia which are Bekok, Pulai, Tiong, Tinggi and Kepong. The fields ...
$3,100