North Malay Basin Gas Project
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- PM301 and PM302
- North Malay Basin Gas Project (PM302)
- Bumi
- Key Development Metrics
- Platform Summary
- Wells
- Bumi
- Exploration costs
- 4 more item(s)...
- Cash Flow
- Gas price
- Global Economic Model (GEM) file
-
Cash Flow
- North Malay Basin Gas Project
- Bumi (PM301)
Tables and charts
This report includes the following images and tables:
- Index Map
- Detail Map
- Participation
- Reserves (2P) at 01/01/2026
- Contingent Resources (2C) at 01/01/2026
- Production (2015-2024)
- North Malay Basin Gas Project (PM302) Production Profile
- Production (2016-2024)
- Bumi (PM301) Production Profile
- Capital Costs Pre-2016 to 2024 (US$ million)
- Operating Costs 2024 to 2033 (US$ million)
- 18 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Arthit
The Arthit fields in blocks B15A and B16A, and the Arthit North fields in B14A, are located in the Malay Basin in the Gulf of Thailand. ...
$3,720Malaysia other fields (onstream)
This report summarises marginal fields in Malaysia that are currently onstream. These fields are considered marginal due to their small ...
$3,720Narrabri Gas Project
The Narrabri project is a proposed coal seam gas (CSG) development. It is located in the Gunnedah Basin, NSW.
$3,720