North Malay Basin Gas Project
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- PM301 and PM302
- North Malay Basin Gas Project (PM302)
- Bumi
- Key Development Metrics
- Platform Summary
- Wells
- Bumi
- Exploration costs
- 4 more item(s)...
- Cash Flow
- Gas price
- Global Economic Model (GEM) file
-
Cash Flow
- North Malay Basin Gas Project
- Bumi (PM301)
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapParticipation
-
Reserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)North Malay Basin Gas Project (PM302) Production ProfileProduction (2016-2024)Bumi (PM301) Production ProfileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)
- 18 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Arthit
The Arthit fields in blocks B15A and B16A, and the Arthit North fields in B14A, are located in the Malay Basin in the Gulf of Thailand. ...
$3,720Surat Gas Project (Arrow)
The Surat Gas Project is a coal seam gas development in the Surat Basin, southeast Queensland. The project is operated by Arrow Energy.
$3,720Bongkot
The Bongkot concession included three blocks - B15, B16 and B17 - in the Gulf of Thailand. It comprised of a collection of ...
$6,900