Asset Report
North West Java Sea (ONWJ)
Report summary
The North West Java Sea PSC, also known as Offshore North West Java or ONWJ, is a mature complex of oil and gas fields located offshore the coast of Java. The contract area is divided into four main field groups: North West Corner, Ardjuna, Bima and Arimbi. Infrastructure within the PSC includes over 300 producing wells and over 200 offshore structures, of which 11 are permanently manned flow-stations for processing and compression. Around 375 pipelines measuring 1,600 kilometres in length connect the fields to the three onshore gas receiving facilities. The PSC was renewed for another 20 years from January 2017. PHE was appointed the sole participant in the renewed block under the new Gross Split PSC. This report includes an overview of trends and activities in the asset with analysis on cost, production, cashflow and fiscal terms.
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
- PSC Extension
- Relinquishments
- Well data
-
Exploration
- Recent exploration
-
Reserves and resources
- Oil
- Gas
- LPG
-
Production
-
Liquids
- Oil
- LPG
- Gas
- Emissions
-
Liquids
-
Development
- Recent development focus
-
Key historical facilities and infrastructure
- Ardjuna
- Bima
- Arimbi
-
Infrastructure
-
Liquids
- Ardjuna
- Arimbi
- Bima
- North West Corner
- Gas
-
Liquids
-
Costs
- Exploration Costs
- Capital Costs
- Operating Costs
-
Sales contracts
- Pertamina
- PLN
- PGN
- Pupuk Kujang
-
Fiscal and regulatory
- Original PSC terms
- 1997 PSC extension terms
- 2017 PSC extension terms
-
Economic assumptions
- Cash Flow
- Discount rate and date
- Inflation rate
- Oil price
- Gas Price
- Global Economic Model (GEM) file
- Economic analysis
Tables and charts
This report includes 26 images and tables including:
- Key facts: Table 1
- Index Map
- North West Java Sea Map
- Well data: Table 1
- Cash Flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Present Value Price Sensitivities
- Participation: Table 1
- Reserves and resources: Table 1
- Reserves and resources: Table 2
- Production: Table 1
- Production: Table 2
- Production Profile
- Infrastructure: Table 2
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Costs: Table 4
- Sales contracts: Table 1
- Sales contracts: Table 2
- Sales contracts: Table 3
- Infrastructure: Table 1
What's included
This report contains:
Other reports you may be interested in
Asset Report
Indonesia proposed LNG Regas projects
A number of companies are eyeing new regasification terminals in Indonesia, particularly in West Java. This is driven by the declining ...
$1,200
Asset Report
South Sumatra-West Java Pipeline
The South Sumatra-West Java (SSWJ) gas transmission project consists of the SSWJ Phase I and SSWJ Phase II pipelines operated by PGN.
$2,150
Asset Report
Nusantara - LNG regas terminal
The PT Nusantara Regas (NR), owned by PERTAMINA has built a 3.0 mmtpa floating regasification terminal in Jakarta Bay, with 125,000m3 ...
$1,200