Asset Report

OML 22

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

  

OML 22 is located onshore Nigeria, 20 kilometres northwest of Port Harcourt in the eastern delta. The block lies outside the near-shore swamp of the Niger Delta and the drier terrain makes the area more favourable for operating. Shell is the operator and it is part of the NNPCL/Shell Joint Venture (JV).Five developed fields are contained within OML 22: Ubie, Mini Nta, Obele, Enwhe and Rumuekpe, which have had a sporadic production history. Production started in 1971 from the Obele field. ...

Table of contents

  • Key facts
    • Summary
    • Key issues
      • Shell agrees to sell its SPDC venture to Renaissance Africa Energy Company
      • Enwhe gas development
      • Petroleum Industry Act (PIA)
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
    • Emissions
    • Oil developments
    • Enwhe gas development
    • Ubie gas resources
    • Rumuekpe gas resources
  • Infrastructure
    • Capital costs
    • Operating costs
    • Petroleum Industry Act
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM)
  • Economic analysis

Tables and charts

This report includes 21 images and tables including:

  • Key facts: Table 1
  • Index Map
  • OML 22 Map
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Production Profile
  • Infrastructure: Table 1
  • Infrastructure: Table 2
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining PV Price Sensitivities
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

What's included

This report contains:

  • Document

    OML 22

    PDF 7.03 MB