Asset Report
OML 24
This report is currently unavailable
Report summary
OML 24 is located 30 kilometres southwest of Port Harcourt and is part of the NNPC/Shell Joint Venture (JV). The block is one of the smallest by area in the JV and lies within the near-shore swamp of the Niger Delta. OML 24 contains three producing fields; Awoba, Awoba Northwest and Ekulama. The Awoba field has sporadically produced sales gas, but only a fraction of its reserves have been produced.The terrain makes for very challenging ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- Significant JV funding constraints
- Alternative Crude Oil Evacuation System (ACOES)
- Petroleum Industry Act
- Location maps
- Participation
- Geology
- Well data
- Exploration
- Reserves and resources
-
Production
- High emissions intensity
-
Development
-
Oil
- Ekulama
- Awoba & Awoba Northwest
-
Gas
- Awoba Associated Gas project
- Awoba Non-Associated Gas project
- Development assumptions
-
Oil
-
Infrastructure
- Alternative Crude Oil Evacuation System (ACOES)
-
Costs
- Capital Costs
- Operating Costs
- Fiscal and regulatory
-
Economic assumptions
- Discount rate and date
- Inflation rate
- Oil price
- Global Economic Model (GEM)
- Economic analysis
Tables and charts
This report includes 24 images and tables including:
- Key facts: Table 1
- Index Map
- OML 24 Map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Reserves and resources: Table 2
- Production: Table 1
- Production: Table 2
- OML 24 Production Profile
- Infrastructure: Table 1
- Cash flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Remaining PV Price Sensitivities
- Infrastructure: Table 2
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
What's included
This report contains:
Other reports you may be interested in
Insight
Nigeria fiscal reform update
A new legislative term begins on 11 June. We review the fiscal year-to-date and what lies ahead.
$1,350
Asset Report
Camden (Ceased)
The Camden Coal Seam Gas (CSG) project was located 50 kilometres southwest of Sydney, New South Wales. Camden was operated by AGL.
$3,100
Market Report
Global solar PV operations and maintenance (O&M) economics 2023
Key pricing trends from leading surveyed providers in the O&M market, major trends affecting O&M spend, and regional cost segmentation.
$5,990