Oseberg Sør Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Infill drilling to continue into the 2030s
- Oseberg gas permit allocation increased in response to European demand
- Power from shore delayed
- Stjerne gas blowdown
- Regular maintenance schedule
- Unitisation
- Emissions
- Drilling
- Capital costs
- Decommissioning costs
-
Operating costs
- Oseberg Sør
- Emissions taxes
- Cash Flow
- Fiscal terms
- Global Economic Model (GEM) file
- 3 more item(s)...
Tables and charts
This report includes the following images and tables:
- Field hydrocarbon characteristics
- Reserves (2P) at 01/01/2025
- Production (2015-2024)
- Oseberg Sør production profile
- Platform summary
- Pipeline summary
- Capital Costs Pre-2016 to 2024 (NKr million)
- Capital Costs 2040 to 2047 (NKr million)
- Operating Costs 2025 to 2034 (NKr million)
- Cash Flow (US$)
- 12 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Gassled-Oseberg Gas Transport
The Oseberg Gas Transport (OGT) Pipeline links the Oseberg-D gas processing platform with the Heimdal riser platform.
$2,580Fram Sør
The Fram Sør fields are north of Troll in the Northern North Sea. The subsea development will be tied back to the Troll C platform.
$3,720Visund Area
Visund Area is made up of five fields: Visund, Visund Nord, Visund Sør, Rhea and Titan. It is located 20 kilometres east of ...
$5,280