Oseberg Unit
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Infill drilling campaign set to continue into the 2030s
- Low-pressure project at Oseberg C
- Gas re-routed from 2023
- Potential development of the Shetland Chalk formation
-
Unitisation
- In-place volumes
- Recovery rates
-
Emissions
- Oseberg Future Development
- Phase One
- Phase Two (Oseberg Nord)
- Phase Three (Gas Export)
- Secondary Recovery
-
Historical infill drilling
- Chalk reservoir
-
Oseberg satellite developments
- Oseberg Vest
- Oseberg Vest Flank
- Oseberg Delta and Delta 2
- Capital costs
- Oseberg Main
- Oseberg Vest
- Oseberg Kappa (includes Kappa and Kappa North)
- Oseberg Delta (includes Delta and Delta S2)
- 12 more item(s)...
Tables and charts
This report includes the following images and tables:
- Field hydrocarbon characteristics
- Capital Costs Pre-2016 to 2024 (NKr million)
- Capital Costs Pre-2014 to 2022 (NKr million)
- Capital Costs Pre-2012 to 2020 (NKr million)
- Capital Costs Pre-2011 to 2019 (NKr million)
- Capital Costs 2016 to 2020 (NKr million)
- Capital Costs Pre-2040 to 2047 (NKr million)
- Operating Costs 2025 to 2034 (NKr million)
- Operating Costs 2025 to 2034 (NKr million)
- Operating Costs 2024 to 2033 (NKr million)
- Cash Flow (US$)
- 20 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Gassled-Oseberg Gas Transport
The Oseberg Gas Transport (OGT) Pipeline links the Oseberg-D gas processing platform with the Heimdal riser platform.
$2,580Oseberg Sør Area
Oseberg Sør is an accumulation of several structures that have been brought onstream in phases.
$5,280Oseberg Øst
Oseberg Øst is located 20 kilometres northeast of the main Oseberg field. .
$5,280