Petrogas A&B gas fields
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
- Petrogas
- Unitisation
- Key participation changes (2010 onwards)
- Geology
- Exploration
- Reserves and resources
- Production
-
Development
-
Producing fields
- Key development metrics
-
Pre-production fields
- Key development metrics
-
Producing fields
- Infrastructure
-
Costs
- Capital costs
- Operating costs
- Sales contracts
- 3 more item(s)...
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Index map
- Petrogas A&B map
- Geology: Table 1
- Exploration: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- A&B Shallow Gas production profile (A/12-FA, A/18-FA and B/13-FA)
- A/15-A production profile
- B/10-FA production profile
- B/16-FA production profile
- 54 more item(s)...
What's included
This report contains:
Other reports you may be interested in
A/6-F/3 Pipeline
The Wintershall Noordzee operated A/6-F/3 gas gathering system was built to transport gas from the German A/6-B/4 gas fields and ...
$2,580Tors
The Tors development comprised two gas fields, Kilmar and Garrow.Kilmar was developed with a normally unmanned installation (NUI) tied ...
Fram Sør
The Fram Sør fields are north of Troll in the Northern North Sea. The subsea development will be tied back to the Troll C platform.
$3,720