Polo Potiguar
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Global Economic Model (GEM) file
- Cash Flow
- Cash flow Polo Ubarana
- Cash flow Polo Canto do Amaro
- Cash flow Polo Alto do Rodrigues
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapParticipation
-
Reserves (2P) at 01/01/2026Production (2012-2021)Polo Alto do Rodrigues Production ProfilePolo Canto do Amaro Production ProfilePolo Ubarana Production ProfileCapital Costs Pre-2013 to 2021 (US$ million)Operating Costs 2020 to 2029 (US$ million)Cash Flow (US$)PV Table (US$)
- 19 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Ceará-Potiguar Basins - Other Fields
The Ceará-Potiguar basins was an important producing area historically, but is no longer an investment priority for Petrobras. ...
$3,720Polo Lagoa Parda
The Lagoa Parda cluster is composed of Lagoa Parda, Lagoa Parda Norte and Lagoa Piabanha fields. It is operated by Imetame Oil in ...
$3,720Polo Alagoas
The Polo Alagoas is a cluster of mature onshore and shallow-water assets. It comprises the Anambé, Arapaçu, Cidade de ...
$3,720