Prudhoe Bay (Prudhoe Bay Unit)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Current investment
- Gas commercialisation
- Initial Interest Alignment
- Reservoir
- Source
- Trap
- Oil/NGLs
- Gas
- Oil
- Gas
- Facilities
-
Pressure support and EOR
- Gas injection
- Water injection
- Miscible injection
- Pipelines
- Development Drilling
- Liquids
- Gas
- Capital Expenditure
- Operating Costs
- 7 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Production (2015-2024)Production ProfilePrudhoe Bay Field Facilities
-
Pump Station 1 SchematicCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026
- 8 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Niakuk (Prudhoe Bay Unit)
The Niakuk field began production from the Cretaceous Kuparuk River Formation in 1994. The field is situated less than two kilometres ...
$3,720Lisburne (Prudhoe Bay Unit)
The Lisburne field is a complex fractured carbonate reservoir which has been developed as a satellite of Prudhoe Bay, within the ...
$3,720Midnight Sun (Prudhoe Bay Unit)
Midnight Sun is a satellite field of Prudhoe Bay and produces primarily from the Kuparuk River Formation. The field was brought ...
$3,720