Raia Project (BM-C-33)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- ANP rules on Raia unitisation
- Gas commercialization
- Additional tie-back opportunity in Itaimbezinho
- History
- Local content
- Reservoir
- Emissions
- Wells
- Capital costs
- Operating costs
- Gas
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Field Hydrocarbon CharacteristicsReserves (2P) at 01/01/2026
-
Production (2026-2035)Production ProfileCapital Costs 2022 to 2031 (US$ million)Operating Costs 2028 to 2037 (US$ million)Annual Gas PricesCash Flow (US$)PV Table (US$)Summary Table (US$)Split of Revenues
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
ETAP (BP)
The Eastern Trough Area Project (ETAP) was established to develop several oil and gas accumulations which were unlikely to prove ...
$5,280Tacuma (Boa Esperanza) copper mine project
A detailed production, commercial and competitive analysis of the Tucuma copper mine project.
$2,250String Music
String Music is a development located in MC 385 comprising the Banjo and Cello subfields.
$3,720