Asset Report
Sanga Sanga (LNG)
Report summary
The Sanga Sanga PSC comprises a series of large onshore gas fields with associated oil and condensate. The key producing fields are Nilam and Badak, which are unitised with the neighbouring Total-operated Offshore Mahakam PSC. Gas from Sanga Sanga was contracted under Bontang LNG Packages I-VII and is transported via pipeline to the Bontang plant. From 2005, the Sanga Sanga PSC has struggled to maintain output, with production falling short of its contractual volumes to the LNG plant. ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
- Recent Activity
- Sanga Sanga CBM PSC
- Field unitisation
- Historical Activity
- Well data
-
Exploration
- Recent exploration
- Historical exploration
- Sanga Sanga (CBM) PSC exploration
-
Reserves and resources
- Sanga Sanga Post-2018
-
Production
- Historical production
-
Development
- Planned development
- Historical development
- CBM development
-
Infrastructure
- Gas
- Liquids
-
Costs
- Exploration costs
- Capital costs
- Operating costs
-
Sales contracts
- Current sales contracts
- Historical sales contracts
- Bontang Pricing Structure
- Java market
- East Kalimantan market
- CBM gas sales
-
Fiscal and regulatory
- Post-2018 PSC terms
- Historical fiscal terms
-
Economic assumptions
- Cash Flow
- Discount rate and date
- Inflation rate
- Oil price
- Gas price
- LPG price
- Global Economic Model (GEM) file
-
Economic analysis
- Cash Flow
Tables and charts
This report includes 31 images and tables including:
- Key facts: Table 1
- Index Map
- Sanga Sanga Map
- Well data: Table 1
- Production: Table 1
- Production: Table 2
- Post-2018 Production Profile
- Participation: Table 1
- Participation: Table 2
- Reserves and resources: Table 1
- Historical Production Profile
- Infrastructure: Table 1
- Infrastructure: Table 2
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Costs: Table 4
- Sales contracts: Table 1
- Sales contracts: Table 2
- Sanga Sanga PSC Post-2018
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Historical Sanga Sanga PSC
- Economic analysis: Table 5
- Economic analysis: Table 6
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
What's included
This report contains:
Other reports you may be interested in
Asset Report
Yemen LNG - Upstream
Yemen LNG (YLNG) is a greenfield project, consisting of two identical trains, each with a production capacity of 3.35 mmtpa. The LNG ...
$3,100
Asset Report
PNG LNG - upstream
The Papua New Guinea LNG (PNG LNG) project is a two-train LNG development operated by ExxonMobil.
$5,750
Asset Report
SK310 (LNG)
The SK310 PSC contains three gas fields which were discovered between 2010 and 2014. The fields are expected to be developed …
$3,100