ZLNG (Petronas FLNG 3) - Commercial Overview
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Links to related report
- Commercial structure
- Timeline
- LNG output
- LNG contracts
- Shipping
- Economic analysis
Tables and charts
This report includes 9 images and tables including:
- Key facts: Table 1
- Commercial structure: Image 1
- Timeline: Table 1
- LNG output: Image 1
- Summary economics
- Breakeven economics (US$/mmBtu)
- FOB breakeven analysis (post-tax)
- Index Map
- Detail Map
What's included
This report contains:
Other reports you may be interested in
PETRONAS FLNG 1 - Commercial overview
PFLNG 1 was the first floating facility in Malaysia, initially moored 180 kilometres offshore Sarawak and received gas from the Kanowit ...
$2,700Genting FLNG - Commercial Overview
The Genting FLNG is an under-construction export facility with two processing trains in the West Papua region, designed with a nominal ...
$2,700MLNG Dua - Commercial Overview
The first MLNG project (MLNG Satu) commenced operations in January 1983 at the MLNG complex in Bintulu, Sarawak, Malaysia. Other ...
$2,700