Asset Report

Saturn Banks

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Saturn Banks hub (formerly Core) is in the Southern Gas Basin, around 40 kilometres north of the Bacton terminal. It comprises six fields - Blythe, Elgood, Southwark (formerly Vulcan South), Nailsworth (formerly Vulcan Northwest), Elland (formerly Vulcan East) and Goddard (formerly Glein). The fields were discovered between1966 and 2006.The project was initially planned into two phases. Phase 1 included Elgood, Blythe and Southwark. A planned second phase included Nailsworth, Elland and ...

Table of contents

  • Summary
    • CalEnergy acquires IOG
    • Blythe back on production following difficult start
    • Elgood and Southwark offline and see reserves downgrade
    • Key licences relinquished as UK regulator declines extension request
    • Historical drilling
    • Platforms
    • Subsea
    • Drilling
    • Bacton
  • Capital costs
  • Decommissioning costs
    • Emissions Trading Scheme (ETS)
  • Cash flow
  • Global Economic Model (GEM) file
  • Cash Flow
    • Blythe
    • Elgood
    • Southwark
  • Indicative Technical Valuations

Tables and charts

This report includes the following images and tables:

    Capital Costs Pre-2019 to 2024 (£ million)Capital Costs 2028 to 2032 (US$ million)Technical fields
    Index mapDetail mapParticipationReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2022-2029)Saturn Banks production profile
  • 23 more item(s)...

What's included

This report contains:

  • Document

    Saturn Banks

    XLS 1.12 MB

  • Document

    Saturn Banks

    PDF 2.62 MB