Asset Report

Saturn Banks

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Saturn Banks hub (formerly Core) is in the Southern Gas Basin, around 40 kilometres north of the Bacton terminal. It comprises six fields - Blythe, Elgood, Southwark (formerly Vulcan South), Nailsworth (formerly Vulcan Northwest), Elland (formerly Vulcan East) and Goddard (formerly Glein). The fields were discovered between 1966 and 2006.The project was initially planned into two phases. Phase 1 included Elgood, Blythe and Southwark. A planned second phase included Nailsworth, Elland ...

Table of contents

  • Key facts
    • Summary
    • Key issues
      • CalEnergy acquires IOG
      • Blythe back on production following difficult start
      • Elgood and Southwark offline and see reserves downgrade
      • Key licences relinquished as UK regulator declines extension request
  • Location maps
  • Participation
  • Geology
  • Well data
    • Historical drilling
  • Reserves and resources
  • Production
    • Key development metrics
  • Infrastructure
    • Operating costs
  • 3 more item(s)...

Tables and charts

This report includes the following images and tables:

    Key facts: Table 1Index mapDetail map
    Participation: Table 1Well data: Table 1Reserves and resources: Table 1Reserves and resources: Table 2Production: Table 1Saturn Banks production profileInfrastructure: Table 1Capital costsDecommissioning costs
  • 13 more item(s)...

What's included

This report contains:

  • Document

    Saturn Banks

    PDF 4.85 MB

  • Document

    Saturn Banks

    XLS 988.50 KB