Asset report

SB K (Kikeh)

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The SB K PSC is located offshore Sabah and lies in water depths ranging from around 920 metres to over 1 400 metres. The block contains a number of commercial oil and gas fields including Kikeh Kakap and Siakap North. The main Kikeh field was Malaysia's first deepwater development with initial oil and gas production achieved in August 2007 and December 2008 respectively. In 2010 an unitisation agreement was reached for the joint development and project sanction was achieved in 2011. The field will be developed as ...

What's included

This report contains

  • Document

    SB K (Kikeh)

    PDF 5.66 MB

  • Document

    SB K (Kikeh)

    XLS 992.00 KB

  • Document

    SB K (Kikeh)

    ZIP 6.51 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
  • Costs
  • Sales contracts
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 30 images and tables including:

Images

  • Index Map
  • Detail Map
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Present Value Price Sensitivities
  • Production Profile

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Sales contracts: Table 1
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Participation: Table 2
  • Participation: Table 3
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Costs: Table 1
  • Economic analysis: Table 4
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4
  • Costs: Table 5
  • Costs: Table 6
  • Costs: Table 7

You may be interested in

Asset report

Tuban (PPEJ)

Asset report

South East Sumatra

Asset report

Rimau

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898