Shetland Gas Plant
Report summary
Table of contents
- Key facts
-
Summary and key issues
-
Summary
- Summary
-
Key issues
- TotalEnergies sells its GLA assets, including the Shetland Gas Plant, to The Prax Group
- More throughput needed to maintain operations at Shetland Gas Plant
- Economics will be helped by Victory tie-back
- Glendronach downgrade due to marginal economics
- Infill drilling and exploration upside
-
Summary
- Location maps
- Participation
-
Development
- Shetland Gas Plant (SGP)
- Shetland Islands Regional Gas Export (SIRGE) Pipeline
-
Throughput
- Shetland Gas Plant throughput
- SIRGE pipeline throughput
-
Costs
- Shetland Gas Plant
- SIRGE Pipeline
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Map
- Participation: Table 1
- Participation: Table 2
- Throughput: Table 1
- Throughput: Table 2
- Throughput: Table 3
What's included
This report contains:
Other reports you may be interested in
Mexilhão
Mexilhão is a large gas field that also serves as a gathering hub for associated and non-associated gas from other developments ...
$3,720Hungary other fields
This report provides reserve and production data for commercial fields in Hungary that are not currently modelled in a detailed asset ...
$3,720Pobuzhsky nickel operation
A detailed analysis of the Pobuzhsky nickel operation.
$2,250