Asset Report

Shetland Gas Plant

From

$1,250.00

You can pay by card or invoice

From

$1,250.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Total-operated Shetland Gas Plant was constructed between 2011 and 2015 to process gas volumes from Greater Laggan Area fields. The plant is at Sullom Voe, adjacent to the existing BP-operated Sullom Voe Terminal. After processing at the Shetland Gas Plant, dry gas is exported to St Fergus (NSMP) via the 234 kilometre long Shetland Island Regional Gas Export (SIRGE) pipeline, which was commissioned in 2016. SIRGE connects to the Frigg UK system at the MCP01 tie-in point. Condensates are ...

What's included

This report contains

  • Document

    Shetland Gas Plant

    PDF 345.98 KB

  • Document

    Shetland Gas Plant

    XLS 236.00 KB

  • Document

    Shetland Gas Plant

    ZIP 541.74 KB

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
    • Shetland Gas Plant
    • Shetland Islands Regional Gas Export (SIRGE) Pipeline
    • Shetland Gas Plant throughput
    • SIRGE Pipeline throughput
    • Shetland Gas Plant
    • SIRGE Pipeline

Tables and charts

This report includes 6 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Participation: Table 2
  • Throughput: Table 1
  • Throughput: Table 2

Images

  • Map

You may be interested in

Asset Report

Greater Laggan Area

Asset Report

Rosebank

Asset Report

St Fergus (NSMP)

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898