Asset report

Shetland Gas Plant

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Total operated Shetland Gas Plant was constructed between 2011 and 2015 to process gas volumes from Greater Laggan Area fields. The plant is at Sullom Voe adjacent to the existing BP operated Sullom Voe Terminal. After processing at the Shetland Gas Plant dry gas is exported to St Fergus (NSMP) via the 234 kilometre long Shetland Island Regional Gas Export (SIRGE) pipeline which was commissioned in 2016. SIRGE connects to the Frigg UK system at the MCP01 tie in point. Condensates are ...

What's included

This report contains

  • Document

    Shetland Gas Plant

    PDF 345.97 KB

  • Document

    Shetland Gas Plant

    XLS 236.00 KB

  • Document

    Shetland Gas Plant

    ZIP 541.73 KB

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
  • Development
  • Throughput
  • Costs

Tables and charts

This report includes 6 images and tables including:

Images

  • Map

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Participation: Table 2
  • Throughput: Table 1
  • Throughput: Table 2

You may be interested in

    
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898