Asset Report

Siri Area

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Siri Area comprises of the Siri, Stine-1 and Stine-2 oil accumulations. It is located in the northern part of the Danish offshore sector, close to the Norway-Denmark median line.The Siri Area was developed on a stand-alone basis because of the distance to the nearest existing infrastructure at Harald. Siri produces via a purpose-built production jack-up platform, linked to a wellhead tower with a steel storage tank on the seabed. Stine-1 is producing via two subsea installations tied ...

Table of contents

  • Summary
    • 2025 production shutdown
    • Late-life stage
    • Workover wells steadied production decline
    • Project Greensand - Carbon capture and storage (CCS) potential
    • Decommissioning plan uncertain
    • Danish carbon tax set to be introduced in 2025
    • Siri Main Field
    • Stine-1 and Stine-2
    • 6 more item(s)...
  • Capital costs
  • Decommissioning costs
    • Emissions taxes
  • Cash flow
  • Fiscal Terms
  • Global Economic Model (GEM) file
  • Cash Flow
  • Cash flow (US$ million)
  • Cash flow (DKr million)

Tables and charts

This report includes the following images and tables:

    Capital Costs Pre-2013 to 2019 ( million)Capital Costs 2027 to 2036 ( million)Cash Flow (US$)
    PV Table (US$)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining Present Value Price SensitivitiesCash Flow (Local Currency)PV Table (Local Currency)Summary Table (Local Currency)
  • 11 more item(s)...

What's included

This report contains:

  • Document

    Siri Area

    PDF 2.44 MB

  • Document

    Siri Area

    PDF 2.44 MB