Asset Report
SK316 (LNG)
Report summary
The SK316 PSC contains a number of gas fields offshore Sarawak that supply feedgas supply to MLNG Train 9 and other liquefaction trains in Bintulu. The first phase of development involved four wells and a central processing platform on the NC3 field. Front-end engineering and design (FEED) for NC3 and NC8 / NC8 SW was completed in 2012. Gas is piped to the E11 hub via a 32 inch pipeline.The larger but high CO2 Kasawari field will be developed in two phases. The first phase involves ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Well data
- Exploration
- Reserves and resources
-
Production
- Gas
- Condensate
-
Development
- Key Development Metrics
- NC3 and NC8
- Kasawari
- Infrastructure
-
Costs
-
Capital Costs
- Decommissioning
- Operating Costs
-
Capital Costs
-
Sales contracts
- Upstream transfer price- legacy fields
- LNG price
- Domestic price
- Upstream transfer price - Malaysia Reference Price (MRP)
- Fiscal and regulatory
-
Economic assumptions
- Cash Flow
- Discount rate and date
- Inflation rate
- Oil price
- LNG Price
- Gas Price
- Global Economic Model (GEM) file
-
Economic analysis
- Indicative technical valuations
Tables and charts
This report includes 28 images and tables including:
- Key facts: Table 1
- Index Map
- Detail Map
- Participation: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Reserves and resources: Table 2
- Fiscal and regulatory: Table 1
- Fiscal and regulatory: Table 2
- Fiscal and regulatory: Table 3
- Cash flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Remaining PV Price Sensitivities
- Production: Table 1
- Production: Table 2
- Production Profile
- Costs: Table 3
- Sales contracts: Table 1
- Sales contracts: Table 2
- Sales contracts: Table 3
- Economic analysis: Table 4
- Costs: Table 1
- Costs: Table 2
What's included
This report contains:
Other reports you may be interested in
Asset Report
Tangguh (LNG)
Largest gas producing asset in Indonesia is expecting first gas from Expansion phase and will FID a CCUS-EGR facility
$5,750
Asset Report
Ichthys LNG - upstream
Ichthys is a giant gas/condensate field located in the Browse Basin, around 440 kilometres north of Broome, offshore Western Australia.
$5,750
Insight
China regas tracker 2024
Monthly update of LNG receiving terminals projects, storage capacity forecasts and available window slots offered by PipeChina
$950