Asset Report

Sole Pit (excl. Galleon)

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Sole Pit Area comprises the Barque, Barque South, Clipper and Skiff gas fields. The Sole Pit fields have been developed in phases. Clipper is the hub, and has six fixed bridge linked platforms. Phase I involved three platforms and was brought onstream in 1990. Phase II involved an extension to Barque and a separate structure known as Barque South. Barque South was brought onstream in 1994, with the Barque Extension onstream in 1995. The Skiff field was developed via the minimum facility ...

Table of contents

  • Summary
    • Uncertainty around future ownership after collapsed deal
    • Fiscal uncertainty may delay development drilling
    • Development drilling
  • Platforms
  • Drilling
  • Capital costs
  • Decommissioning costs
    • Tariff receipts
  • Cash flow
  • Global Economic Model (GEM) file
  • Cash Flow
  • Cash flow (US$ million)
  • 1 more item(s)...

Tables and charts

This report includes the following images and tables:

    Barque platform summaryClipper platform summarySkiff platform summary
    Pipeline summaryCapital Costs Pre-2020 to 2023 (£ million)Capital Costs 2037 to 2040 (£ million)Operating Costs 2025 to 2033 (£ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - Undiscounted
  • 19 more item(s)...

What's included

This report contains:

  • Document

    Sole Pit (excl. Galleon)

    PDF 3.11 MB

  • Document

    Sole Pit (excl. Galleon)

    PDF 3.11 MB