Sole Pit (excl. Galleon)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Uncertainty around future ownership after deal cancelled
- System-wide cessation of production (COP) brought forward to 2031
- Emissions
- Platforms
- Drilling
- Capital costs
- Decommissioning costs
-
Operating costs
- Cost shares
- Tariff receipts
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
- Cash flow (US$ million)
- 1 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Barque platform summaryClipper platform summarySkiff platform summary
-
Pipeline summaryCapital Costs Pre-2020 to 2025 (US$ million)Capital Costs 2031 to 2040 (US$ million)Barque Cash Flow (US$)Barque South Cash Flow (US$)Clipper Cash Flow (US$)Skiff Cash Flow (US$)PV Table (US$)Summary Table (US$)
- 20 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Mostar aluminium smelter
A detailed analysis of the Mostar aluminium smelter.
$2,250Galleon
The Galleon gas field is located within the Sole Pit area of the Southern Gas Basin. The field has been in production for 30 years and ...
$3,720Bangkanai
Bangkanai PSC is located in Central Kalimantan, around 200 kilometres from the coastal city of Balikpapan in East Kalimantan.
$3,720