Asset Report

South Howarime (Block 43)

Get this report

$3,100

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The South Howarime contract area is situated in the Say'un Al Masila Basin, east of the prolific Masila fields. The Nabrajah field was discovered in 2004 and brought onstream in July 2005. Despite potential particularly from the fractured basement, appraisal drilling has been disappointing and reserves have been downgraded. Production has continued to decline, despite infill drilling. Operations were suspended in March 2015, due to the escalation of hostilities in Yemen.

Table of contents

  • Key facts
    • Summary
    • Key issues
      • Issues common to the Masila Fields, Central Yemen
      • Issues specific to South Howarime (Block 43)
  • Location maps
    • DNO
    • Kuwait Energy Company (KEC)
    • State-carried interest
    • Paying interest participation
    • Relinquishment
    • Regional Tectonic Setting
    • Reservoirs
  • Well data
    • Canadian Occidental
    • First Calgary / Ocean Energy
    • DNO
    • Nabrajah Discovery
    • Basement and Naifa Discoveries
    • Basement Disappointments
    • Exploration Disappointments
  • Reserves and resources
  • Production
    • Wells
    • Facilities
  • Infrastructure
    • Exploration Costs
    • Capital Costs
    • Operating Costs
      • Tariffs
    • Royalty
    • Cost Oil
    • Profit Oil
    • State-carried interest
    • Income Tax
    • Fixed Tax
    • Bonuses
      • Signature Bonus
      • Other Bonuses
      • Production Bonuses
    • Gas
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 21 images and tables including:

  • Key facts: Table 1
  • Index Map
  • South Howarime (Block 43) Map
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production Profile
  • Infrastructure: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Participation: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Costs: Table 3
  • Fiscal and regulatory: Table 3

What's included

This report contains:

  • Document

    South Howarime (Block 43)

    PDF 6.47 MB

  • Document

    South Howarime (Block 43)

    XLS 826.00 KB