Asset Report

Suncor Mining Project

From

$1,700.00

You can pay by card or invoice

From

$1,700.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Suncor Base Mine began development in the 1960s, representing the first commercial oil sands mining project. The oil sand is recovered using conventional mining techniques, from which bitumen is extracted and then upgraded into Synthetic Crude Oil (SCO). Upgraders at the mining project are also used to upgrade bitumen produced from Suncor's nearby SAGD operations, namely Firebag. This analysis excludes production and upgrading operations associated with SAGD production. For a ...

What's included

This report contains

  • Document

    Suncor Mining Project

    PDF 1.21 MB

  • Document

    Suncor Mining Project

    XLS 530.00 KB

  • Document

    Suncor Mining Project

    ZIP 1.62 MB

Table of contents

  • Key facts
    • Summary
      • Recent events
      • Upgrading outages and maintenance
      • Potential Expansion
      • Fiscal Terms
  • Location maps
  • Participation
  • Geology
  • Exploration
  • Reserves and resources
    • Outlook
    • Recent production impacts
    • Historical production impacts
    • Upgrading maintenance schedule
    • Mining
    • Extraction
    • Upgrading
    • Other Projects
  • Infrastructure
  • Sales contracts
    • 2015 changes
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Gas price
    • Exchange rate
    • Global Economic Model (GEM) files
  • Economic analysis

Tables and charts

This report includes 21 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Production: Table 1
  • Production: Table 2
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

Images

  • Suncor Mining Project Index Map
  • Suncor Mining Project Detail Map
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining Present Value Price Sensitivities
  • Bitumen Production Profile

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898