Suncor SAGD Project (Firebag)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Upgrading recent events
- Upgrading history
- Upgrading maintenance schedule
- Emissions
- SAGD Recovery Method
-
Production Facilities
- Wells
- Facilities
- Pipelines
- Utility Corridor
- Upgrader
- Technology
-
Capital Costs
- SAGD Capex
- Phase 1 (1999-2003)
- Phase 2 and Co-generation Expansion (2003-2007)
- Phase 3 (2006-2011)
- Sulphur Plant (2006-2009)
- Phase 4 (2006-2012)
- Debottleneck (2012-2015)
- Future Drilling
- 3 more item(s)...
-
Operating Costs
- Extracting Cost
- Steam Gas Cost
- Fuel Gas Upgrader
- Upgrading Cost
- Carbon Costs
- Transportation Cost
- Total Opex
- Sector-wide changes
- Cash flow
- Oil price
- Gas price
- Global Economic Model (GEM) file
- 2 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Suncor SAGD Index MapSuncor SAGD Detail MapParticipation
-
Reservoir CharacteristicsReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Suncor Mining Project
The Suncor Base Mine began development in the 1960s, representing the first commercial oil sands mining project. The oil sand is ...
$3,720Kerr-Sulphurets-Mitchell (KSM) gold mine project
A detailed analysis of the Kerr-Sulphurets-Mitchell (KSM) gold mine project.
$2,250PAK - Lithium mine project
A detailed analysis of the PAK lithium mineral project.
$2,250