Tethys Petroleum fields
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Corporate
-
Licences
- Akkulkov
- Kiziloi
- Kul-Bas
- Kiziloi
-
Akkulkov
- Overview
- Gas
- Oil
- Klymene (Kul-Bas block)
- Reported data
-
Modelling
- Reserves
- Contingent resources
- Key development metrics
- Development timeline
-
Oil
- Aral Oil Terminal (AOT)
- Current routes
- Future routes
-
Gas
- Current
- Future
- Capital costs
- 9 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index mapTethys Petroleum fields mapKiziloi reservoir quality
-
Kiziloi hydrocarbon qualityKey recent and future E&A wellsDiscovery summaryCapital Costs Pre-2015 to 2023 (US$ million)Operating Costs 2024 to 2033 (US$ million)Annual gas priceCash Flow (US$)PV Table (US$)Summary Table (US$)
- 21 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Kazakhstan other fields
This report provides reserve and production data for commercial fields in Kazakhstan that are not currently modelled in a detailed ...
$5,280ETAP (Shell)
The Eastern Trough Area Project (ETAP) is a group of nine fields in the Central North Sea, located around 220 kilometres east of ...
$3,720Minor Fields
This analysis presents summary data for fields in Colombia that have minor production and/or limited remaining reserves and are not ...
$3,720