Asset Report
Tors
Report summary
The Tors development comprises two gas fields, Kilmar and Garrow, tied back to Trent in the Southern Gas Basin.Kilmar was developed with a normally unmanned installation (NUI) tied back to the Perenco-operated Trent platform. The NUI has six well slots and was designed with spare capacity, including additional risers and j-tubes, to allow it to act as a potential tie-in hub. Garrow was developed as a tie-back to the Kilmar NUI.Upon taking over operatorship in 2014, Alpha Petroleum made ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
- Well data
- Reserves and resources
- Production
- Infrastructure
-
Costs
-
Capital costs
- Garrow
- Kilmar
- Decommissioning costs
-
Operating costs
- Emissions Trading Scheme (ETS)
-
Capital costs
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Gas price
- Carbon price
- Exchange rate
- Fiscal terms
- Global Economic Model (GEM) file
-
Economic analysis
- Cash Flow
Tables and charts
This report includes 25 images and tables including:
- Key facts: Table 1
- Index map
- Tors map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Tors production profile
- Infrastructure: Table 1
- Costs: Table 3
- Cash flow (US$ million)
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining PV Price Sensitivities
- Cash flow (£ million)
- Economic analysis: Table 5
- Economic analysis: Table 6
- Costs: Table 1
- Costs: Table 2
- Costs: Table 4
What's included
This report contains: