Asset Report

Transmed Pipeline

From

$1,250.00

You can pay by card or invoice

From

$1,250.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Transmed pipeline system transports gas from the Hassi R'Mel field onshore Algeria, across Tunisia and the Mediterranean to Sicily and onwards to the Italian mainland. Transmed forms the back-bone of the Italian gas transmission system. It is 1,575 kilometres long and terminates at Minerbio, near Bologna, in the Po Valley. The first phase of the pipeline system came onstream in 1983, with an initial annual capacity of 16 bcm (1,550 mmcfd). A second parallel pipeline to expand the ...

What's included

This report contains

  • Document

    Transmed Pipeline

    PDF 4.26 MB

  • Document

    Transmed Pipeline

    XLS 94.50 KB

  • Document

    Transmed Pipeline

    ZIP 4.33 MB

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
    • Background
    • Pipeline Routing
    • Phase I
    • Phase II
    • Phase III
  • Throughput
  • Costs
    • SNAM
    • Enel
    • Edison Gas
    • Tunisia
    • Others

Tables and charts

This report includes 3 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1

Images

  • Map

You may be interested in

Country Report

Italy upstream summary

Asset Report

In Salah

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898