Asset Report

Troll Oil Pipelines

Get this report

$2,150

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Troll oil pipelines (Troll Oljerør) provide an export solution for Troll oil production. Two separate oil pipelines have been constructed, one from Troll B and one from Troll C. Both pipelines terminate at the Mongstad terminal and refinery near Bergen.Troll Oljerør I was built in conjunction with the development of the oil province in the western part of the field. The pipeline came onstream in 1995 together with the Troll B platform. Troll Oljerør II was built to ...

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
    • Phase One
    • Phase Two
  • Throughput
    • Capital Costs
    • Operating Costs
  • Fiscal and regulatory
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Exchange rate
  • Economic analysis

Tables and charts

This report includes 18 images and tables including:

  • Key facts: Table 1
  • Troll Oil Pipelines Map
  • Participation: Table 1
  • Throughput: Table 1
  • Throughput: Table 2
  • Liquids throughput profile
  • Cash Flow (US$ million)
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Cash Flow (NKr million)
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Costs: Table 1
  • Costs: Table 2

What's included

This report contains:

  • Document

    Troll Oil Pipelines

    PDF 3.12 MB

  • Document

    Troll Oil Pipelines

    XLS 628.00 KB