Asset Report

Troll Oil Pipelines

Get this report

$1,700

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

21 April 2017

Troll Oil Pipelines

Report summary

The Troll oil pipeline development (Troll Oljerør) was initiated to provide an export solution for Troll oil production. Two separate oil pipelines have been constructed, one from Troll B and one from Troll C. Both pipelines terminate at the Mongstad terminal and refinery near Bergen.Troll Oljerør I was built in conjunction with the development of the oil province in the western part of the field and came onstream in 1995 together with the Troll B platform. Troll ...

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
    • Phase One
    • Phase Two
  • Throughput
    • Capital Costs
    • Operating Costs
  • Fiscal and regulatory
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Exchange rate
  • Economic analysis

Tables and charts

This report includes 18 images and tables including:

  • Key facts: Table 1
  • Troll Oil Pipelines Map
  • Participation: Table 1
  • Throughput: Table 1
  • Throughput: Table 2
  • Liquids Throughput Profile
  • Cash Flow (US$ million)
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2019
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2019)
  • Cash Flow (NKr million)
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Costs: Table 1
  • Costs: Table 2

What's included

This report contains:

  • Document

    Troll Oil Pipelines

    PDF 907.97 KB

  • Document

    Troll Oil Pipelines

    XLS 347.50 KB

  • Document

    Troll Oil Pipelines

    ZIP 857.92 KB