Asset Report

Troll Oil Pipelines

Get this report*

$2,580

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Troll oil pipelines (Troll Oljerør) provide an export solution for oil processed at the Troll facilities. Two separate oil pipelines have been constructed, one from the Troll B platform and one from the Troll C platform. Both pipelines terminate at the Mongstad terminal and refinery near Bergen.Troll Oljerør I was built in conjunction with the development of the oil province in the western part of the field. The pipeline came onstream in 1995 together with the Troll B ...

Table of contents

  • Phase One
  • Phase Two
  • Capital Costs
  • Operating Costs
  • Fiscal terms
  • Global Economic Model (GEM) file
  • Cash Flow (US$ million)
  • Cash Flow (NKr million)

Tables and charts

This report includes the following images and tables:

    Liquids throughput profileLiquids throughput profileCapital Costs Pre-2017 to 2025 (US$ million)
    Transport Cash Flow US$Transport PV Table US$Transport Summary Table US$Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining Revenue Distribution (Discounted at 10% from 01/01/2026)Transport Cash Flow (Local Currency)Transport PV Table (Local Currency)
  • 1 more item(s)...

What's included

This report contains:

  • Document

    Troll Oil Pipelines

    XLS 515.50 KB

  • Document

    Troll Oil Pipelines

    PDF 2.22 MB