Western Isles Project
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
- Well data
- Exploration
- Reserves and resources
- Production
-
Development
- FPSO
- Infrastructure
-
Costs
- Operating costs
- 3 more item(s)...
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Index map
- Western Isles Project map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Western Isles Project production profile
- Capital costs
- Costs: Table 2
- Decommissioning costs
- 12 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Block 192
Block 192 (formerly Block 1-AB) was the top liquids producer in Peru before the Camisea gas/condensate project came onstream in 2004. ...
$3,720Ekofisk PPF
The Ekofisk 'Previous Produced Fields' (PPF) project includes the joint re-development of the Albuskjell, Vest Ekofisk and ...
$3,720Gassled-Zeepipe Terminal Zeebrugge
The Zeebrugge terminal receives gas, via Zeepipe, from fields such as Troll and Sleipner.
$2,580