Asset Report

Westgastransport system (WGT) incl extension

Get this report*

$2,580

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

High-Cal Westgastransport (WGT) pipelineThe Wintershall Noordzee operated Westgastransport (WGT) pipeline is a high-calorific gas gathering system, originally laid in 1975 to transport gas from the NAM-operated Joint Development Area (JDA) fields and the Noordwinning group fields K/13 and K/10a (now ceased). The pipeline terminates at the gas processing plants in Balgzandpolder, near Den Helder.Low-Cal Westgastransport (WGT) pipelineIn 1983, a separate pipeline was installed from the ...

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
    • Pipelines
      • Low-Cal pipeline
      • WGT Extension
    • Terminal
  • Throughput
    • Tariff Income
    • Capital costs
      • Abandonment costs
    • Operating costs
  • Fiscal and regulatory
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Exchange rate
    • Global Economic Model (GEM) files
    • WGT High-Cal line
      • US$ million
      • million
    • WGT Markham (Extension)
      • US$ million
      • million

Tables and charts

This report includes the following images and tables:

    Key facts: Table 1Westgastransport system mapParticipation: Table 1
    WGT High-Cal pipelineThroughput: Table 2WGT Lo-Cal pipelineThroughput: Table 4WGT Markham extensionThroughput: Table 6WGT Hi-Cal pipeline throughput profileWGT Lo-Cal pipeline throughput profileEconomic analysis: Table 1
  • 19 more item(s)...

What's included

This report contains:

  • Document

    Westgastransport system (WGT) incl extension

    PDF 1.58 MB

  • Document

    Westgastransport system (WGT) incl extension

    XLS 1.14 MB