White Rose Project
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- West White Rose construction delays
- Re-sanctioned in May 2022, construction back underway
- FPSO maintenance in 2024
- Gas reserves
- Location maps
- Participation
- Geology
- Well data
- Exploration
- Reserves and resources
-
Production
- Emissions
-
Development
- Key Development Metrics
- Infrastructure
-
Costs
- Capital Costs
- Operating Costs
- 4 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Key facts: Table 1Newfoundland Index MapJeanne d'Arc Basin Detail Map
-
Participation: Table 1Participation: Table 2Geology: Table 1Well data: Table 1Exploration: Table 1Reserves and resources: Table 1Reserves and resources: Table 2Production: Table 1Production: Table 2
- 24 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Great White (AC 857)
Great White is a large oil and gas field, located in the southern portion of the Alaminos Canyon protraction area, approximately 10 ...
$6,900Morrison copper mine project
A detailed analysis of the Morrison copper mineproject.
$2,250Yellowhead copper mine project
A detailed analysis of the Yellowhead copper mine project.
$2,250