Asset Report

Yombo

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Yombo heavy oil field was discovered in 1988. The field was developed using two wellhead platforms tied-back to a floating production storage and offloading (FPSO) vessel, where all the crude was processed. Perenco has operated the field since 2002. The field was operated under concession terms until 2015 when a new production sharing contract (PSC) was signed. We include reserves from both contracts in this analysis.Masseko Phase 1 came onstream in 2019. It is located 10 kilometres ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
    • Emissions
    • Yombo
      • Platforms
      • Floating, Production, Storage and Offloading (FPSO) vessel
      • Drilling
    • Masseko
    • Exploration costs
    • Capital costs
    • Operating costs
  • Fiscal and regulatory
  • 2 more item(s)...

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Index Map
  • Yombo Map
  • Participation: Table 1
  • Participation: Table 2
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Yombo Concession production profile
  • 18 more item(s)...

What's included

This report contains:

  • Document

    Yombo

    PDF 7.84 MB