Asset Report
Zarzaitine
This report is currently unavailable
Report summary
The Zarzaitine oil field has been producing since 1960. Sinopec signed an Enhanced Oil Recovery (EOR) contract with Sonatrach to redevelop the field in October 2002 and planned to increase the recovery factor from 40% to 50%.Sinopec planned on raising production in two phases through the introduction of tertiary recovery methods in addition to renovating the existing water injection facilities and optimising the gas ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
- Well data
- Exploration
- Reserves and resources
- Production
- Development
- Infrastructure
-
Costs
- Capital costs
- Operating costs
-
Fiscal and regulatory
- 2022 PSC
- 2002 EOR Contract
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Global Economic Model (GEM) file
-
Economic analysis
- Cash Flow
Tables and charts
This report includes 23 images and tables including:
- Key facts: Table 1
- Index Map
- Zarzaitine Map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Historical production profile (prior to 2002)
- EOR production profile (2002-2050)
- Infrastructure: Table 1
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Fiscal and regulatory: Table 1
- EOR project
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining PV Price Sensitivities
What's included
This report contains: