Asset Report

Zarzaitine

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Zarzaitine oil field has been producing since 1960. Sinopec signed an Enhanced Oil Recovery (EOR) contract with Sonatrach to redevelop the field in October 2002 and planned to increase the recovery factor from 40% to 50%.Sinopec planned on raising production in two phases through the introduction of tertiary recovery methods in addition to renovating the existing water injection facilities and optimising the gas ...

Table of contents

Tables and charts

This report includes 23 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Zarzaitine Map
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Historical production profile (prior to 2002)
  • EOR production profile (2002-2050)
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Fiscal and regulatory: Table 1
  • EOR project
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining PV Price Sensitivities

What's included

This report contains:

  • Document

    Zarzaitine

    PDF 6.49 MB