Royal Mountain King (Closed) gold mine
The mine was shut down in July, 1994 on depletion of the ore reserve. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a ...
Polaris (Closed) zinc mine
Capital costs were $89M plus $32M working capital. Standard work schedule 11 hour shifts, six days per week, thirty-five weeks per year. Pine Point...
Viga iron ore mine
Viga is a mid-sized surface mine owned and operated by Vale located near the town of Congonhas in Minas Gerais state, Brazil. The operation produce...
Vishakhapatnam zinc smelter
The Vishakhapatnam (Vizag) zinc smelter was commissioned in 1977 specifically to treat imported concentrates. The capacity at commissioning was 30k...
Volgograd aluminium smelter
The smelter was commissioned in 1959 and is one of Rusal's highest cost assets. Wood Mackenzie’s asset reports are built from the bottom up, incorp...
Warrego Tailings (Closed) gold mine
The treatment plant was constructed to process tailings from the Warrego copper-gold mine, which ceased operation in 1989 on depletion of reserves....