Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Most popular reports
Metals costs Insights reports
Cajamarquilla (Electrolytic) zinc smelter
The Cajamarquilla smelter in Peru uses roast, leach, electrowin technology to produce slab zinc. Leach residue is treated by the Goethite process. ...
Baiyin (ISF) smelter
The original capacity of the No3 Smelter was 35kt/a zinc. In 2001 a major smelter renovation plan was instigated with the intention of raising the ...
Hikoshima zinc smelter
The Hikoshima smelter, located in Shimonoseki, Japan, uses roast, leach, electrowin technology to produce slab zinc. leach residue are sent to othe...
South Flank iron ore mine
BHP's South Flank mine started production in May 2021. The mine was completed on budget with a total capital intensity of US$45 per tonne. The Sout...
San Luis Potosi zinc smelter
The San Luis Potosi smelter was commissioned in November 1982 at a cost of US$200M. The planned capacity was 113kt/a zinc but as the roasting capac...
Torreon zinc smelter
The zinc smelter was commissioned in 1973 with a capacity of 100kt/a, the original earlier site operation comprising a lead-silver smelting plant o...
Viewing page 90 of 471