Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Huelva copper smelter
The Huelva smelter was commissioned in 1970 with two Momoda blast furnaces, Peirce-Smith converters and anode furnaces. An Outokumpu flash furnace ...
IMI (closed) copper refinery
The refinery is located in Walsall near Birmingham and has excellent road links. Anodes are supplied from a secondary copper smelter on the same si...
Kansanshi copper smelter
The smelter started operating in February 2015 and its capacity is 300kt/a anodes. Wood Mackenzie’s asset reports are built from the bottom up, inc...
Khetri (closed) copper smelter
The smelter was commissioned in 1974 with the present capacity of 31kt/a anode. Concentrate is mainly provided from the adjacent mine and from Hind...
Kosaka copper refinery
The refinery is located at Kosaka, Aomori prefecture, and has excellent road and rail links. The tankhouse was commissioned in 1902 with a capacity...
La Oroya (closed) copper refinery
The refinery is located at Huaymanta, 4km from La Oroya, Yauli Province and has adequate road and rail links. The plant is adjacent to the La Oroya...
Viewing page 291 of 448