Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Linzhou aluminium smelter
Lines 1 and 2 were permanently closed in 2011. We start costing the Linzhou smelter from the start up of Prebake Line 3. Wood Mackenzie’s asset rep...
Lista aluminium smelter
Lista was the last Søderberg line to be installed in Norway. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of...
Liuzhou Longcheng zinc smelter
The zinc smelter was put into operation in 1990 and comprised roasting and sulphuric acid plants. Slab zinc capacity was originally 35kt/a, but thi...
Longquan (Yichuan) aluminium smelter
Longquan comprises two separate plants, which we cost as a single entity. Wood Mackenzie’s asset reports are built from the bottom up, incorporatin...
Loulo gold mine
Loulo commenced operations in November 2005 and began as two open pit mines. Subsequently, two underground mines have been developed at the Gara an...
Louvicourt (Closed) zinc mine
The Louvicourt mine closed in 2005. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to...
Viewing page 398 of 448