Asset Report
Hellyer Tailings Restart zinc mine
Report summary
Hellyer project is located in North-West Tasmania, Australia. This profile covers the 8Mt reserves of ore contained within existing tailings dam at Hellyer operation. Tailings dredging and pumping of slurry commenced in August 2018, whereas base metal flotation circuit was commissioned in the same month. Concentrate production and shipping was expected in late 2018. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset
Table of contents
- Summary
- Key issues
- Emissions
- Mining
- Process
Tables and charts
This report includes 2 images and tables including:
- Hellyer Tailings Restart Emission Intensity Quartile Ranking - total global production - tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Hellyer Tailings (Closed) zinc mine
A detailed analysis of the Hellyer Tailings zinc mine.
$2,250
Asset Report
Woodlawn Restart zinc mine project
A detailed analysis of the Woodlawn Restart zinc mine project.
$2,250
Asset Report
Kipushi Restart zinc mine
A detailed analysis of the Kipushi Restart zinc mine.
$2,250