Metals costs reports
Pobuzhsky nickel operation
Prior to its acquisition by Solway in 2003, Pobuzhsky (built in 1972) had been under receivership and idle for more than 3 years due to unprofitabl...
Podgorica alumina refinery
The Podgorica refinery was commissioned as the Titograd operation in 1972. It was put in operation to supply the adjacent smelter. The refinery has...
Point Comfort alumina refinery
AWAC is owned by Alcoa 60% and Alumina Ltd 40%. Point Comfort is the largest alumina refinery in the USA. Wood Mackenzie’s asset reports are built ...
Point Henry aluminium smelter
Point Henry was commissioned in 1963, making it the second oldest aluminium smelter in Australia after Bell Bay. The smelter is owned through the A...
Polaris (Closed) zinc mine
Capital costs were $89M plus $32M working capital. Standard work schedule 11 hour shifts, six days per week, thirty-five weeks per year. Pine Point...
Portovesme (ISF) zinc smelter
The Porto Vesme ISF was commissioned in 1972 with a design capacity of 72kt/a zinc. In 1995, the ISF was uprated by enlarging the hearth and shaft ...