Alba aluminium smelter
Alba indicated (in 2009) that Lines 1 and 2 (combined capacity 150kt/a) would be closed when Line 6 is finished. Feasibility studies for Line 6 and...
Chifeng zinc smelter
The original smelter at Chifeng had a capacity of 21kt/a and was commissioned in 1995. This was expanded to 50kt/a in 2003, with the addition of a ...
Debari zinc smelter
The Debari smelter was commissioned in 1968 and had a capacity of 18kt/a zinc to treat concentrates from the Zawar group of mines. Installing a new...
Clarksville zinc smelter
The Clarksville electrolytic zinc smelter was built on a greenfield site and commissioned in 1979. The design capacity was for a production of 81.6...
Ronnskar copper smelter
The Ronnskar copper smelter was commissioned in 1930 to treat concentrates from the company's own mines. A lead smelter was constructed on the same...
Shahumyan (Kapan) zinc mine
Kapan is an underground mine with a plant capacity of 750kt/a. Chaarat Gold acquired the asset from Polymetal in 2019, transforming the company fro...