The reserves shown in the table above reflect upstream supply volumes that are currently modelled. In our LNG supply forecast we expect ...
The NLNG plant is supplied with feedgas from five gas gathering networks: GTS1 through to 5
NLNG Six involved the construction of the sixth train at NLNG, increasing total capacity to 22.2 mmtpa
Nigeria LNG (NLNG) is a non-integrated LNG supply project with a current total capacity of 22 mmtpa. NLNG 7 - sanctioned in December ...
The Plus project exports 8.1 mmtpa with additional LPG export capacity
NLNG Base is a two train LNG plant, which was the first to export LNG from Nigeria in 1999.
In 2002 a third train at NLNG started production. This expansion included an LPG plant, allowing wet gas to be accepted for the first time.