Asset Report

Nigeria LNG (NLNG) - Transportation Infrastructure

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The NLNG plant is supplied with feedgas via six major pipelines known as the gas transmission system (GTS).GTS-1 is a 36-inch onshore pipeline extending 149 kilometres from the Agip JV's Obiafu-Obrikom gas plant to NLNG, terminating in a 150 m3 slugcatcher. Its maximum capacity is 1,250 mmcfd. A 40-kilometre long, 600 mmcfd branch line connects the Shell JV's Soku field to GTS-1 at Rumuji. A line also connects supply from the Obite gas plant which is part of the TotalEnergies JV. ...

Table of contents

  • Development

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Transportation Infrastructure

    PDF 794.49 KB