Asset report

Nigeria LNG (NLNG) - Transportation Infrastructure

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The NLNG plant is supplied with feedgas via six major pipelines known as the gas transmission system (GTS).GTS-1 is an onshore pipeline extending 149 kilometres from the Agip JV's Obiafu-Obrikom gas plant to NLNG, terminating in a 150 m3 slugcatcher. Its maximum capacity is 1,250 mmcfd. A 40 kilometres long, 600 mmcfd branch line connects the Shell JV's Soku field to GTS-1 at Rumuji. A line also connects supply from the Obite gas plant which is part of the Total JV. GTS-1 is owned ...

What's included

This report contains

  • Document

    Transportation Infrastructure

    PDF 240.89 KB

Table of contents

  • Development

Tables and charts

No table or charts specified

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898