Asset Report
Arch Resources Western Bituminous coal mines
Report summary
This report contains details on Arch's Western Bituminous operation - West Elk. In 2023, West Elk encountered geological issues resulting in reduced production for the year. The report includes forecasts for production, cash costs, capital expenditures, quality, and reserves. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry-standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download, which enables interrogation of a whole series of cost and production metrics over the asset's life.
Table of contents
- Summary
- Key issues
Tables and charts
This report includes 14 images and tables including:
- Detailed map - North Folk Valley, Colorado
- Participation
- Coal seams
- Marketable reserves (at 01/01/2024)
- Mine summary 2023
- Infrastructure
- Domestic FOB mine cash costs 2023 (US$/short ton)
- Export FOB port cash costs 2023 (US$/short ton)
- Company average cash costs and margin (US$/short ton)
- Capital costs (US$ million)
- Product quality
- Economic assumptions
What's included
This report contains:
Other reports you may be interested in
Asset Report
American Consolidated Natural Resources Western Bituminous coal mines
A detailed analysis of the ACNR - Western Bituminous coal mines.
$2,550
Asset Report
Wolverine Fuels Western Bituminous coal mines
A detailed analysis of the Wolverine Fuels - Western Bituminous coal mines.
$2,550
Asset Report
Peabody Western Bituminous coal mines
A detailed analysis of the Peabody Western Bituminous coal mines.
$2,550