Bumi Barito Mineral Stage 2 coal mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Emissions
Tables and charts
This report includes the following images and tables:
-
Bumi Barito Mineral Stage 2 Emission Intensity Quartile ranking – total global production - saleable tonnes
What's included
This report contains:
Other reports you may be interested in
414 Mine - Lithium mine
A detailed analysis of the 414 Mine lithium mineral operation.
$2,250Thermal coal: 5 things to look for in 2026
A mix of familiar challenges and emerging shifts merging for global seaborne thermal coal markets
$1,100Didipio copper mine
A detailed analysis of the Didipio copper mine.
$2,250