Asset Report
Mustika Indah Permai coal mine
Report summary
The Mustika Indah Permai (MIP) started production in 2020. It is a low rank thermal coal operation located in the Lahat regency, South Sumatra. Adaro Energy, one of Indonesia's largest coal companies, acquired 75% of MIP in 2011. The project is a 2,000 ha 20 year IUP concession granted in 2010. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
Tables and charts
This report includes 13 images and tables including:
- Detailed map
- Participants (%)
- Coal seams
- Marketable reserves
- Production
- Production
- Operations
- Infrastructure
- Cash costs (US$/tonne)
- Cash Costs
- Capital Cost (US $ million)
- Coal quality
- Economic Assumptions
What's included
This report contains:
Other reports you may be interested in
21 August 2021
Tepian Indah Sukses coal mine
Asset Report
Tepian Indah Sukses coal mine
Detailed asset level data for this mine or project.
$2,55027 August 2019
Palopo Indah Raya coal mine
Asset Report
Palopo Indah Raya coal mine
A detailed analysis of the Palopo Indah Raya coal mine.
$2,55024 August 2021
Anugerah Bara Kaltim coal mine
Asset Report
Anugerah Bara Kaltim coal mine
A detailed analysis of the Anugerah Bara Kaltim coal mine.
$2,550