Asset Report

Mustika Indah Permai coal mine

Get this report

$2,550

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Mustika Indah Permai (MIP) started production in 2020. It is a low rank thermal coal operation located in the Lahat regency, South Sumatra. Adaro Energy, one of Indonesia's largest coal companies, acquired 75% of MIP in 2011. The project is a 2,000 ha 20 year IUP concession granted in 2010. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues

Tables and charts

This report includes 13 images and tables including:

  • Detailed map
  • Participants (%)
  • Coal seams
  • Marketable reserves
  • Production
  • Production
  • Operations
  • Infrastructure
  • Cash costs (US$/tonne)
  • Cash Costs
  • Capital Cost (US $ million)
  • Coal quality
  • Economic Assumptions

What's included

This report contains:

  • Document

    Mustika Indah Permai coal mine

    PDF 1.20 MB

  • Document

    Mustika Indah Permai coal mine

    ZIP 1.13 MB

  • Document

    Asset_Mustika Indah Permai.xlsx

    XLSX 154.32 KB

  • Document

    Mustika Indah Permai LIVE Indonesia BASE.xls

    XLS 550.50 KB