Asset report

New Acland Stage 3 Extension coal mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

New Acland Stage 3 Extension is a surface coal project, located 150 kilometres west of Brisbane in the Darling Downs region of Queensland (QLD), producing thermal coal predominantly for the export market. New Acland Stage 3 Extension will be performed within Mining Lease Application 50232 and involves the extension and operation of the existing New Acland mine. The proposed extension and expansion of the mine under MLA50232 will adjoin the southern and western boundaries of the current mining lease.

What's included

This report contains

  • Document

    Asset New Acland Stage 3 Extension.xls

    XLS 210.50 KB

  • Document

    New Acland Stage 3 Extension-Australia-BASE.XLS

    XLS 558.00 KB

  • Document

    New Acland Stage 3 Extension coal mine

    PDF 349.80 KB

  • Document

    New Acland Stage 3 Extension coal mine

    ZIP 517.05 KB

Table of contents

Tables and charts

This report includes 14 images and tables including:

Images

  • Detailed map
  • Production: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Coal seams
  • Marketable reserves (at 01/01/2018)
  • Operations
  • Infrastructure
  • Product quality
  • Economic assumptions
  • Participation: Table 1
  • Production
  • Costs: Table 1
  • Capital costs

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898