Wolverine Fuels Western Bituminous coal mines
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key facts
- Skyline
- SUFCO
- Dugout
- Bowie #2
Tables and charts
This report includes 15 images and tables including:
- Participation
- Coal seams
- Marketable reserves (01/01/2024)
- Production
- Mine summary 2023
- Infrastructure
- Domestic cash costs 2023 (US$/short ton)
- Export cash costs 2023 (US$/short ton, FOB port)
- Company cash costs and margin (US$/short ton)
- Cash costs
- Capital costs (US$ million)
- Coal quality
- Economic assumptions
What's included
This report contains:
Other reports you may be interested in
Peabody Western Bituminous coal mines
A detailed analysis of the Peabody Western Bituminous coal mines.
$2,550Arch Resources Powder River Basin coal mines
A detailed analysis of the Arch - Powder River Basin coal mines.
$2,550Bongara (Corianta) (Closed) zinc mine
A detailed analysis of the Bongara (Corianta) (Closed) zinc mine.
$2,250