Does Europe need more regas capacity?
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Germany power market long-term outlook: May 2024
We present our May 2024 long-term outlook for the German power market, with fully integrated supply-demand analysis and prices.
$15,000Isle of Grain - LNG regas terminal
The Isle of Grain terminal was constructed in 1982 and is a key UK import terminal with the second largest regas capacity in Europe
$1,450Aliaga LNG - LNG regas terminal
Turkey's second regasification terminal, located at Aliaga, was completed in 2001 and has a regas capacity of 12.2 mmtpa.
$1,450