India's 21-day coronavirus led lockdown: energy sector in turmoil
Report summary
Table of contents
-
Executive summary
- What does the 21-day lockdown mean?
- What remains operational?
- What has been the impact on power demand?
- What does this slowdown in power generation and industrial production mean for coal demand and supply?
- Do you anticipate any impact on the renewables?
- Gas and LNG demand was robust until mid-March, how has the situation changed?
- How hard will oil products and fuel demand be hit?
- With fuels demand set to crash, how are refining companies responding?
- What options are left with domestic exploration and production companies?
- What more should the industry worry about post 14 April?
Tables and charts
This report includes 3 images and tables including:
- Decline in demand compared y-o-y
- Decline in generation since 22 Mar compared w-o-w
- Oil demand expected to decline in the short term
What's included
This report contains:
Other reports you may be interested in
11 March 2022
Hitachi copper refinery
Hitachi copper refinery
A detailed analysis of the Hitachi copper refinery.
$2,25001 February 2023
Steel short-term outlook January 2023
Steel short-term outlook January 2023
Steel to evoke the tale of two halves in 2023
$5,00027 December 2017
Shandong - LNG regas terminal
Shandong - LNG regas terminal
The Shandong LNG regas terminal is located at Dongjiakou port in Qingdao, Shandong province. This project is Sinopec's first regas ...